Renew tile as a layered floor assembly rather than a new pattern over an unknown base.
Confirm the replacement specification
Ask the tile provider to assess support, movement, substrate preparation, tile format and transitions. Where water exposure matters, define the waterproofing system and its interfaces separately from the visible grout.
Resolve the cause before closing the work
Recurring cracks can reflect movement below the tile. Older materials and damaged substrate need an agreed investigation and removal plan before the finish is selected as the solution.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: prepared assembly documented, movement and wet-area details reviewed, curing and care instructions retained. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Tile format and pattern
- Substrate and movement assessment
- Waterproofing where applicable
- Removal and adjacent levels
What should be checked?
- Prepared assembly documented
- Movement and wet-area details reviewed
- Curing and care instructions retained
Questions worth asking
What should be settled before the new item is ordered?
Start with tile format and pattern and substrate and movement assessment. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Curing and care instructions retained. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.