Renew the shower base with the drain and wall waterproofing treated as one coordinated detail.
Confirm the replacement specification
Compare footprint, curb, drain location and the selected system’s support requirements. Ask how retained wall surfaces meet the new base and who verifies the assembled water-management detail.
Resolve the cause before closing the work
A base-only change may be unsuitable when the surrounding waterproofing cannot be connected reliably. Loose tile, damp substrate or unexplained leakage can expand the necessary corrective scope.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: support and drain interface confirmed, applicable water checks documented, enclosure and curing restrictions explained. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Base and drain geometry
- Substrate condition
- Wall waterproofing connection
- Enclosure and finish reinstatement
What should be checked?
- Support and drain interface confirmed
- Applicable water checks documented
- Enclosure and curing restrictions explained
Questions worth asking
What should be settled before the new item is ordered?
Start with base and drain geometry and substrate condition. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Enclosure and curing restrictions explained. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.