Renew the roof covering with the deck, flashings and water-management details included in the proposal.
Confirm the replacement specification
Identify roof geometry, covering, leak history and existing ventilation. Ask what will be removed, how exposed decking is assessed, and who owns flashings, penetrations, underlay and temporary weather protection.
Resolve the cause before closing the work
A new covering does not automatically correct attic moisture or structural trouble. Concealed deterioration needs a documented approval process before extra work and before the roof is closed.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: concealed findings documented, agreed roof details reviewed, product and work records supplied. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Roof geometry and covering
- Deck and flashing condition
- Access and weather protection
- Waste handling and finish interfaces
What should be checked?
- Concealed findings documented
- Agreed roof details reviewed
- Product and work records supplied
Questions worth asking
What should be settled before the new item is ordered?
Start with roof geometry and covering and deck and flashing condition. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Product and work records supplied. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.
Bring the details together.
Add this service to My project. Tell HAUSE what you have, what you want to achieve and where the work is needed. A clearer brief makes it easier to discuss the right assessment, responsible trades and written scope.
Build my project brief ↗