Settle the sink, counter and drain interface before removing the old bowl.
Confirm the replacement specification
Share top-mount or undermount construction, cut-out, bowl depth and faucet arrangement. Ask who assesses counter support, clips or bonding, drain position and access inside the cabinet.
Resolve the cause before closing the work
A deeper or differently shaped sink may conflict with existing pipework or storage. Damaged counter edges and wet cabinet material need correction before the new sink is enclosed.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: support and mounting confirmed, drain and supply operation checked, cabinet condition and finish recorded. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Sink and cut-out dimensions
- Counter material and mounting
- Drain and accessory compatibility
- Cabinet and seal restoration
What should be checked?
- Support and mounting confirmed
- Drain and supply operation checked
- Cabinet condition and finish recorded
Questions worth asking
What should be settled before the new item is ordered?
Start with sink and cut-out dimensions and counter material and mounting. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Cabinet condition and finish recorded. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.
Bring the details together.
Add this service to My project. Tell HAUSE what you have, what you want to achieve and where the work is needed. A clearer brief makes it easier to discuss the right assessment, responsible trades and written scope.
Build my project brief ↗