Renew the ventilator with duct connections, drainage and airflow commissioning included in the brief.
Confirm the replacement specification
Identify existing HRV or ERV type, duct layout and control arrangement. Ask how the selected unit will fit the space and how required airflow settings and system balance will be established.
Resolve the cause before closing the work
Matching cabinet size does not establish compatible performance. An HRV-to-ERV change or revised ventilation strategy needs an explicit assessment of the home rather than a purely physical swap.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: equipment and controls identified, agreed airflow results recorded, filter and core care explained. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Unit and airflow selection
- Duct and control adaptation
- Drain and service access
- Measurement and balancing scope
What should be checked?
- Equipment and controls identified
- Agreed airflow results recorded
- Filter and core care explained
Questions worth asking
What should be settled before the new item is ordered?
Start with unit and airflow selection and duct and control adaptation. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Filter and core care explained. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.
Bring the details together.
Add this service to My project. Tell HAUSE what you have, what you want to achieve and where the work is needed. A clearer brief makes it easier to discuss the right assessment, responsible trades and written scope.
Build my project brief ↗