Plan the bath as part of the floor, drain and surround assembly that makes the room usable.
Confirm the replacement specification
Confirm tub dimensions, material, access route and manufacturer support requirements. Ask who owns drain connection, valve access, waterproofing transitions and replacement of surrounding wall finishes.
Resolve the cause before closing the work
A new tub does not correct hidden moisture damage or a failed wall assembly. The proposal should explain how those findings are assessed and approved before the surround closes.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: support and drain checks recorded, waterproofing interfaces documented, curing and use instructions supplied. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Tub type and carrying route
- Floor support and drain access
- Surround waterproofing boundary
- Removal and room reinstatement
What should be checked?
- Support and drain checks recorded
- Waterproofing interfaces documented
- Curing and use instructions supplied
Questions worth asking
What should be settled before the new item is ordered?
Start with tub type and carrying route and floor support and drain access. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Curing and use instructions supplied. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.