Renew the mirror with safe support and the surrounding wall finish planned.
Confirm the replacement specification
Share dimensions, weight, mounting type and whether lighting or demisting equipment is connected. Ask how the existing mirror will be removed and how damaged wall material or adhesive will be addressed.
Resolve the cause before closing the work
A larger mirror can conceal rather than repair a damp wall. Electrical connections and heavy or fragile handling require an appropriate separate trade or equipment scope.
Specify the handover before ordering
Agree the completion checklist before the replacement is ordered: mounting support confirmed, edges and position reviewed, connected features checked by responsible trade. Identify who supplies the product, removes the old item and restores adjacent finishes. The final invoice should distinguish the replacement from any separately approved correction discovered once the existing component is exposed.
What shapes the scope?
- Mirror size and weight
- Fixing and wall condition
- Connected lighting or demister
- Removal and wall restoration
What should be checked?
- Mounting support confirmed
- Edges and position reviewed
- Connected features checked by responsible trade
Questions worth asking
What should be settled before the new item is ordered?
Start with mirror size and weight and fixing and wall condition. Add dated photographs and describe when the concern occurs. A precise brief helps the provider decide what can be assessed on the first visit and what needs a separate investigation.
What belongs in the completion record?
Keep the exact replacement identity, the agreed checks and any unresolved limitation together. Connected features checked by responsible trade. Use Maintaining for its subsequent care, with the new manual rather than the old product’s assumptions.
Bring the details together.
Add this service to My project. Tell HAUSE what you have, what you want to achieve and where the work is needed. A clearer brief makes it easier to discuss the right assessment, responsible trades and written scope.
Build my project brief ↗